The Nice Apollo MB1050 is a plastic AC control box assembly for compatible Nice Apollo gate operator systems using the 1050 controller platform. It is commonly listed with the controller, OXI receiver, ABF antenna kit, two 8Ah batteries, and 320W power supply.
This is a loaded control enclosure, not just a bare box. The MB1050 should be matched to the operator package, actuator type, wiring harnesses, safety devices, and UL325 requirements before ordering.
| Feature | Specification |
|---|---|
| Manufacturer | Nice / Apollo |
| Product Type | Loaded AC control box assembly |
| Part Number | MB1050 |
| Controller | 1050 control board platform |
| Enclosure | Plastic AC control box |
| Common Included Components | 1050 board, OXI receiver, ABF antenna kit, two 8Ah batteries, 320W power supply |
| Approx. Dimensions | 14.25 in W x 15.125 in H x 9 in D reference |
| Application | Compatible Nice Apollo swing gate operator systems |
| Safety Compliance | UL325 7th Edition compliant listing reference |
| Notes | Match enclosure, controller, and actuator configuration |
The controller may be the same family as other 1050 packages, but the enclosure type, included receiver, antenna kit, batteries, and power supply can change the correct SKU.
Gate control boxes include line-voltage and battery-backed circuits. Do not perform unsafe electrical work or bypass monitored entrapment protection. Installation, wiring, programming, and safety testing should be performed by a qualified gate technician.
No. It is commonly listed as a loaded plastic AC control box assembly with the 1050 controller and related components.
Listings commonly identify the 1050 control board, OXI receiver, ABF antenna kit, two 8Ah batteries, and 320W power supply.
No. It must match the operator package, actuator type, harnesses, and controller configuration.
No. MBAC1050 is a related loaded control box reference but is commonly associated with a different enclosure package. Confirm the exact SKU.
Limits, force, accessory wiring, receiver function, battery backup, monitored safety devices, and all entrapment protection must be tested after installation.