Genie GLA24V Residential Linear Actuator Swing Gate Operator Dual Kit
The Genie GLA24V dual kit is a residential vehicular swing gate operator package designed for select dual-leaf swing gate installations. It uses linear actuator arms for primary and secondary gate operation where the gate size, gate weight, hinge condition, post layout, duty cycle, and installation geometry meet Genie specifications.
This is a dual swing gate operator kit, not a universal actuator package for every two-leaf gate. Each gate leaf must be checked for length, weight, hinge condition, swing direction, mounting geometry, wind load, and safety-device requirements before ordering. Dual installations also require proper primary/secondary setup, actuator wiring, bi-parting delay adjustment, and monitored entrapment protection.
Primary Use
- Residential vehicular swing gate automation for dual-leaf gate installations
- Linear actuator operation for select two-leaf swing gates where mounting geometry allows
- Residential gates up to 16 ft wide or 850 lb per gate leaf where the gate and installation conditions meet Genie specifications
- Applications requiring primary and secondary actuator control from one compatible GLA24V control system
- Installations requiring battery backup, monitored safety inputs, onboard solar charge controller, and Genie Intellicode radio control
- Dual-gate applications requiring adjustable bi-parting delay where configured through the operator controls
Compatible With
Use the Genie GLA24V dual kit only where both gate leaves and the installation site match the operator specifications. Gate length and weight ratings do not guarantee proper operation if either gate leaf is dragging, binding, misaligned, wind-loaded, damaged, or installed with incorrect actuator geometry.
- Select residential dual swing gates where each gate leaf is within the published GLA24V gate rating
- Dual-leaf swing gate applications requiring primary and secondary linear actuator operation
- Residential vehicular gate installations with up to 150 cycles per day where the duty cycle is within specification
- Applications using compatible Genie 315/390 MHz Intellicode transmitters where programmed to the onboard receiver
- Installations requiring monitored safety photo eyes, monitored safety edges, or other approved UL325 entrapment-protection devices
- Solar-capable installations where the solar panel, battery capacity, sun exposure, and accessory load are properly matched
- Aladdin Connect applications where the optional compatible Wi-Fi board is added and the site has suitable network coverage
Features and Specifications
| Specification | Details |
| Brand | Genie |
| Model | GLA24V |
| Product Type | Residential vehicular swing gate operator dual kit |
| Operator Style | Linear actuator swing gate operator |
| Gate Type | Residential vehicular dual swing gate |
| Maximum Gate Rating | Up to 16 ft wide or 850 lb per gate leaf where the gate and installation conditions meet Genie specifications |
| Daily Cycle Rating | Up to 150 cycles per day |
| Duty Cycle | 50% |
| Motor | 24VDC motor |
| Primary Power | 115VAC, field adjustable to 230VAC where installed according to Genie documentation |
| Battery Backup | Battery backup supported; two 12V 7Ah batteries are commonly listed with the GLA24V control system |
| Optional Battery Upgrade | Optional larger 12V 33/35Ah batteries may be supported where installed according to Genie documentation |
| Battery Backup Cycles | Up to 250 cycles on fully charged batteries, depending on gate condition, accessory load, temperature, and battery condition |
| Opening Time | 15 to 18 seconds at 90 degrees where installed and adjusted correctly |
| Maximum Opening Swing | Up to 110 degrees where site geometry allows |
| Solar Support | Onboard solar charge controller; solar panel and sizing should be confirmed separately |
| Radio Receiver | Advanced 315/390 MHz Genie Intellicode receiver with storage for up to 250 transmitters |
| Accessory Power | 24VDC switched and constant accessory power, up to 800mA combined where specified |
| Safety Inputs | Four monitored safety inputs for approved entrapment-protection devices |
| Auxiliary Relays | Two auxiliary relays, configurable from the LCD interface where supported |
| Control Interface | Dual-line backlit LCD display with adjustable settings |
| Dual Gate Functions | Control system ready for secondary arm where specified; adjustable bi-parting delay from LCD |
| Timed Functions | Timer-to-close and built-in 7-day timer where configured |
| Smart Control | Aladdin Connect ready with optional compatible Wi-Fi board |
| Construction | Cast aluminum upper and lower body with stainless steel extension tube |
| Manual Release | Keyed release lever for manual operation |
| Temperature Range | -4 degrees F to 140 degrees F, or -20 degrees C to 60 degrees C, where specified |
| UL Listing | UL325 listed for Class I, II, and III applications where installed as required |
Typical Dual Kit Contents
Package contents can vary by supplier SKU and production version. Confirm the current dual kit contents before ordering, especially if the installation needs monitored safety devices, additional brackets, wire, solar equipment, exit devices, or access control accessories.
- Control box, where included with the dual kit
- Primary gate actuator arm, where included
- Secondary gate actuator arm, where included
- Gate brackets and post brackets, where included
- Two 12V 7Ah batteries, commonly listed with the GLA24V control system
- Remote transmitters, where included by the supplier package
- Warning signs, keys, and actuator mounting hardware, where included
- Monitored photo eye kit or other safety-device package contents should be verified before publishing or ordering
Important Comparison With Similar Genie Gate Operators
Genie offers more than one residential 24V gate operator. Match the gate type, operator style, and single versus dual setup before ordering.
- GLA24V Dual Kit: Linear actuator residential swing gate operator package for select dual-leaf swing gates.
- GLA24V Single Kit: Related single-leaf package. Do not assume a single kit includes the secondary actuator needed for a two-leaf gate.
- GRSW24V: Residential swing gate operator in a different arm/operator style. It should not be treated as the same as the GLA24V linear actuator.
- GRSL24V: Residential slide gate operator. This is for slide gates, not swing gates.
- Aladdin Connect Wi-Fi board: Optional accessory for smart control readiness. It is not the same as the gate operator kit unless specifically included.
- Solar panel kit: The operator has an onboard solar charge controller, but the solar panel and sizing should be confirmed separately.
- Safety photo eyes and edges: Required monitored entrapment protection devices are separate safety components unless specifically included in the kit.
Also Known As / Related Part Numbers
- GLA24V
- Genie GLA24V
- Genie GLA24V dual kit
- Genie GLA24V residential swing gate operator dual kit
- Genie residential vehicular swing gate operator dual kit
- Genie linear actuator dual swing gate operator
- Genie 24VDC dual swing gate actuator operator
- Genie GLA24V dual linear actuator swing gate opener
- Residential Swing Gate Operator - Dual Kit
- Genie GLA24V primary and secondary actuator kit
- Genie GLA24V two leaf swing gate operator
- GLA24V single kit - related one-leaf version, not the same dual kit package
- GRSW24V - related Genie residential swing gate operator, not the same linear actuator model
- GRSL24V - related Genie residential slide gate operator, not for swing gates
Technician Notes
- Check both gate leaves before sizing the operator. If either leaf drags, sags, binds, flexes, or has worn hinges, the operator can be overloaded even when the published gate rating looks acceptable.
- Confirm gate length, gate weight, hinge offset, post position, opening angle, and actuator mounting dimensions for both the primary and secondary leaves.
- Confirm pull-to-open versus push-to-open requirements. Some sites may need separate push-to-open brackets or different actuator geometry.
- Do not overlook wind load. A lighter solid-panel gate can be harder on the actuators than a heavier open-frame gate.
- Plan conduit and wiring between the primary control side and the secondary actuator before installation. Cable routing, voltage drop, water intrusion, and driveway crossings should be handled correctly.
- Confirm monitored safety devices before installation. Dual swing gates often create multiple entrapment zones, including both open and close directions.
- Battery backup performance depends on battery age, charge level, accessory load, temperature, gate condition, and cycle frequency.
- For solar installations, size the solar panel and batteries based on dual-actuator load, daily cycles, accessory draw, shade, local weather, and recovery time.
- Set the primary and secondary timing carefully. Incorrect bi-parting delay can cause one gate leaf to hit the other, bind at the center stop, or close out of sequence.
Before Ordering Checklist
- Confirm the exact model is Genie GLA24V.
- Confirm the application is a residential dual swing gate, not a slide gate or single-leaf gate.
- Confirm each gate leaf is within the 16 ft or 850 lb rating and that both leaves move freely by hand.
- Confirm the daily cycle requirement is within the 150 cycles per day rating.
- Confirm installation geometry, hinge offset, post type, opening angle, and actuator mounting points for both gate leaves.
- Confirm whether each leaf is pull-to-open or push-to-open and whether additional brackets are needed.
- Confirm line voltage requirements, including 115VAC or field-adjusted 230VAC setup by a qualified installer.
- Confirm conduit, wire routing, secondary actuator cable path, and voltage drop requirements.
- Confirm required monitored photo eyes, safety edges, warning signs, and other UL325 safety devices for the complete dual-gate layout.
- Confirm whether the dual kit includes both actuator arms, batteries, remotes, photo eye kit, brackets, keys, signs, and installation hardware.
- Confirm whether optional items such as Aladdin Connect Wi-Fi, solar panel, keypad, exit loop, vehicle sensor, receiver, or additional safety devices are needed.
Professional Advisory
A dual swing gate operator installation involves moving gate panels, pinch points, monitored safety devices, high-voltage line power, low-voltage controls, batteries, solar charging, radio programming, primary/secondary actuator wiring, and possible access control equipment. Installation should be performed by a qualified gate operator technician, especially where the gate is heavy, wind-loaded, dual-leaf, damaged, or connected to access control, fire access, vehicle detection, or safety circuits. Do not bypass monitored photo eyes, safety edges, inherent entrapment protection, warning devices, fuses, grounding, or operator control protections.
Product Q&A
What type of gate is the Genie GLA24V dual kit made for?
The Genie GLA24V dual kit is made for select residential vehicular dual swing gates. It uses linear actuator arms and should be installed only where both gate leaves, hinges, mounting geometry, and safety-device layout match Genie specifications.
What size gate can the Genie GLA24V dual kit operate?
The GLA24V is rated for gate leaves up to 16 ft wide or 850 lb where the gate is properly built, balanced, and free-moving. Wind load, hinge drag, poor alignment, and incorrect actuator geometry can reduce real-world performance.
Is this Genie GLA24V listing for a single gate or dual gate?
This listing is for a dual kit. It should be treated as a two-leaf swing gate operator package where the supplier confirms that primary and secondary actuator components are included.
Does the Genie GLA24V dual kit include battery backup?
Yes. The GLA24V supports battery backup and is commonly listed with two 12V 7Ah batteries for the control system. Backup performance depends on battery condition, gate condition, accessory load, temperature, and the number of cycles during an outage.
Is the Genie GLA24V dual kit solar compatible?
The GLA24V includes an onboard solar charge controller, but the solar panel and battery sizing must be matched to the site. Dual-gate load, shade, accessory draw, daily cycles, and local weather can affect solar performance.
Does the Genie GLA24V dual kit work with Aladdin Connect?
The GLA24V is Aladdin Connect ready when the compatible optional Wi-Fi board is added. Do not assume Wi-Fi control is included with the base dual kit unless the package contents specifically list the Wi-Fi board.
What safety devices are needed with a Genie GLA24V dual gate installation?
The GLA24V has monitored safety inputs and must be installed with the required entrapment-protection devices for the full dual-gate layout. Photo eyes, safety edges, warning signs, and other safety devices should not be bypassed or omitted.